A tower. What Johannesburg Water (JW) reported about it, from March 2025.

Latest JW report

JW reported a scheduled overnight closure on 29 September 2026 at 20:15. The board read “No pumping overnight.” JW put it on its website 1 October 2026 at 13:40. JW's page for this board ↗ · JW's image of the board ↗

Live updates during the day: Johannesburg Water ↗ and OurPower ↗. This page keeps the history.

Suburbs it supplies

JW's pages and notices link no suburb to Protea Glen Tower.

Up the supply chain

On 7 February 2026, JW reported Protea Glen Tower critically low

Where the water comes from, top to bottom, and what JW reported for each part on 7 February 2026. A suburb draws on every supply listed at once; JW does not say which street each one reaches.

Showing 7 February 2026. Other days: 7 February 2026, or the last day.

Bulk supply

Unknown

Protea Glen Tower: no public JW source names its system or the Rand Water station that feeds it

System

Unknown

No public JW source names the system for these supplies.

Supply

Protea Glen Tower

JW reported critically low at 08:40, then a scheduled overnight closure at 21:06.

As printed: “08:40 No pumping, reservoir level critically low”; “21:06 No pumping overnight.”

JW's reported status of the reservoir or tower, not measured water at taps. Boards from March 2025.

Source: Johannesburg Water's System Update boards and notices, read by us. How this record is made.

Cite this figure

watersearch (2026). “On 7 February 2026, JW reported Protea Glen Tower critically low”. Data release 2026-09-29-318d9dca. https://watersearch.co.za/reservoir/protea-glen-tower#fig-chain

The data as a table
PartWhat it isFeedsHow we knowOn 7 February 2026
UnknownChain stopsthe systemProtea Glen Tower: no public JW source names its system or the Rand Water station that feeds itNo JW status for it
Protea Glen TowerTowerJW's page or noticecritically low

Protea Glen Tower over time

In 2026 so far, JW reported Protea Glen Tower short of water on 1 day

What JW reported each day, 3 March 2025 to 29 September 2026, one row a month; the number at the right is the month's days short of water. Based on 192 days with a JW report. A day counts as short of water when JW's worst report for it that day was “poor pressure to no water” or “critically low”. Gaps: Protea Glen Tower: no report from 3 March 2025 to 2 June 2025; Protea Glen Tower: no report from 25 June 2025 to 31 January 2026.

2025
MarNo JW boards, Mar to May
Jun1 Jun: no report2 Jun: no report3 Jun: supplying fairly4 Jun: no report5 Jun: no report6 Jun: no report7 Jun: no report8 Jun: no report9 Jun: no report10 Jun: no report11 Jun: no report12 Jun: no report13 Jun: no report14 Jun: no report15 Jun: no report16 Jun: no report17 Jun: no report18 Jun: no report19 Jun: no report20 Jun: no report21 Jun: no report22 Jun: no report23 Jun: supplying fairly24 Jun: supplying fairly25 Jun: no report26 Jun: no report27 Jun: no report28 Jun: no report29 Jun: no report30 Jun: no report0
JulNo JW boards, Jul 2025 to Jan 2026
2026
Feb1 Feb: supplying fairly2 Feb: supplying fairly3 Feb: supplying fairly4 Feb: supplying fairly5 Feb: no report6 Feb: no report7 Feb: critically low8 Feb: supplying adequately9 Feb: supplying fairly10 Feb: no report11 Feb: no report12 Feb: no report13 Feb: no report14 Feb: no report15 Feb: no report16 Feb: no report17 Feb: no report18 Feb: no report19 Feb: no report20 Feb: no report21 Feb: no report22 Feb: no report23 Feb: no report24 Feb: no report25 Feb: no report26 Feb: no report27 Feb: no report28 Feb: no report1
Mar1 Mar: no report2 Mar: no report3 Mar: no report4 Mar: no report5 Mar: no report6 Mar: no report7 Mar: no report8 Mar: no report9 Mar: no report10 Mar: no report11 Mar: supplying fairly12 Mar: no report13 Mar: supplying fairly14 Mar: supplying fairly15 Mar: supplying fairly16 Mar: supplying fairly17 Mar: supplying fairly18 Mar: supplying fairly19 Mar: supplying fairly20 Mar: supplying fairly21 Mar: supplying adequately22 Mar: supplying adequately23 Mar: supplying adequately24 Mar: supplying adequately25 Mar: supplying adequately26 Mar: supplying adequately27 Mar: supplying fairly28 Mar: supplying fairly29 Mar: supplying fairly30 Mar: supplying fairly31 Mar: supplying fairly0
Apr1 Apr: supplying fairly2 Apr: supplying fairly3 Apr: supplying fairly4 Apr: supplying fairly5 Apr: supplying fairly6 Apr: supplying fairly7 Apr: supplying fairly8 Apr: supplying fairly9 Apr: supplying fairly10 Apr: supplying fairly11 Apr: supplying adequately12 Apr: supplying adequately13 Apr: supplying fairly14 Apr: supplying adequately15 Apr: supplying fairly16 Apr: supplying fairly17 Apr: supplying adequately18 Apr: supplying adequately19 Apr: supplying adequately20 Apr: supplying adequately21 Apr: supplying adequately22 Apr: supplying adequately23 Apr: supplying adequately24 Apr: supplying adequately25 Apr: supplying adequately26 Apr: supplying adequately27 Apr: supplying adequately28 Apr: supplying adequately29 Apr: supplying adequately30 Apr: supplying adequately0
May1 May: supplying adequately2 May: supplying adequately3 May: supplying adequately4 May: supplying adequately5 May: supplying fairly6 May: supplying adequately7 May: supplying adequately8 May: supplying fairly9 May: supplying adequately10 May: supplying fairly11 May: supplying adequately12 May: supplying adequately13 May: supplying fairly14 May: supplying fairly15 May: supplying fairly16 May: supplying fairly17 May: supplying adequately18 May: supplying adequately19 May: supplying adequately20 May: supplying adequately21 May: supplying adequately22 May: supplying adequately23 May: supplying adequately24 May: supplying adequately25 May: supplying adequately26 May: supplying adequately27 May: supplying adequately28 May: supplying adequately29 May: supplying adequately30 May: supplying fairly31 May: supplying fairly0
Jun1 Jun: supplying fairly2 Jun: supplying fairly3 Jun: supplying fairly4 Jun: supplying fairly5 Jun: supplying fairly6 Jun: supplying adequately7 Jun: supplying fairly8 Jun: supplying fairly9 Jun: supplying fairly10 Jun: supplying fairly11 Jun: supplying fairly12 Jun: supplying fairly13 Jun: supplying fairly14 Jun: supplying fairly15 Jun: supplying fairly16 Jun: supplying fairly17 Jun: supplying fairly18 Jun: supplying fairly19 Jun: supplying fairly20 Jun: supplying adequately21 Jun: supplying adequately22 Jun: supplying adequately23 Jun: overnight closure24 Jun: supplying adequately25 Jun: supplying adequately26 Jun: supplying adequately27 Jun: supplying adequately28 Jun: supplying adequately29 Jun: overnight closure30 Jun: overnight closure0
Jul1 Jul: overnight closure2 Jul: supplying adequately3 Jul: supplying adequately4 Jul: overnight closure5 Jul: supplying adequately6 Jul: supplying adequately7 Jul: supplying adequately8 Jul: supplying adequately9 Jul: supplying adequately10 Jul: supplying fairly11 Jul: supplying fairly12 Jul: supplying fairly13 Jul: supplying fairly14 Jul: supplying fairly15 Jul: supplying fairly16 Jul: supplying fairly17 Jul: supplying fairly18 Jul: supplying fairly19 Jul: supplying fairly20 Jul: supplying fairly21 Jul: supplying fairly22 Jul: supplying fairly23 Jul: supplying fairly24 Jul: supplying adequately25 Jul: supplying adequately26 Jul: supplying adequately27 Jul: supplying adequately28 Jul: supplying adequately29 Jul: supplying adequately30 Jul: supplying adequately31 Jul: supplying adequately0
Aug1 Aug: no report2 Aug: no report3 Aug: supplying fairly4 Aug: supplying fairly5 Aug: supplying fairly6 Aug: supplying fairly7 Aug: supplying fairly8 Aug: supplying fairly9 Aug: no report10 Aug: no report11 Aug: supplying adequately12 Aug: supplying adequately13 Aug: supplying adequately14 Aug: supplying adequately15 Aug: no report16 Aug: no report17 Aug: supplying fairly18 Aug: supplying adequately19 Aug: supplying fairly20 Aug: supplying adequately21 Aug: supplying adequately22 Aug: no report23 Aug: no report24 Aug: supplying adequately25 Aug: overnight closure26 Aug: supplying adequately27 Aug: supplying adequately28 Aug: no report29 Aug: no report30 Aug: no report31 Aug: supplying adequately0
Sep1 Sep: supplying adequately2 Sep: supplying adequately3 Sep: supplying adequately4 Sep: overnight closure5 Sep: no report6 Sep: no report7 Sep: supplying adequately8 Sep: supplying fairly9 Sep: supplying fairly10 Sep: supplying fairly11 Sep: supplying adequately12 Sep: no report13 Sep: no report14 Sep: supplying adequately15 Sep: supplying adequately16 Sep: supplying adequately17 Sep: supplying adequately18 Sep: supplying adequately19 Sep: no report20 Sep: no report21 Sep: supplying adequately22 Sep: supplying adequately23 Sep: supplying adequately24 Sep: no report25 Sep: supplying adequately26 Sep: no report27 Sep: no report28 Sep: supplying adequately29 Sep: supplying adequately0
  • water as normal
  • supplying fairly
  • JW warned
  • low, or weak in places
  • short of water
  • critically low
  • shut for the night
  • no JW report
  • still filling in

JW's reported status of the reservoir or tower, not measured water at taps. Boards from March 2025.

Source: Johannesburg Water's System Update boards and notices, read by us. How this record is made.

Cite this figure

watersearch (2026). “In 2026 so far, JW reported Protea Glen Tower short of water on 1 day”. Data release 2026-09-29-318d9dca. https://watersearch.co.za/reservoir/protea-glen-tower#fig-year

The data as a table
MonthDays reportedDays in recordAdequate or fairPoor pressure in places, or lowWarning: no water may occurPoor pressure to no waterCritically lowOvernight closure
March 2025029000000
April 2025030000000
May 2025031000000
June 2025330300000
July 2025031000000
August 2025031000000
September 2025030000000
October 2025031000000
November 2025030000000
December 2025031000000
January 2026031000000
February 2026728600010
March 202620312000000
April 202630303000000
May 202631313100000
June 202630302700003
July 202631312900002
August 202620311900001
September 202620291900001

From April to September 2026 (six months), JW reported Protea Glen Tower short of water on 0 of 162 reported days

Days per month short of water, stacked: critically low at the base. The tick is the median supply in the city that month. The strip under each bar is the share of days with a JW report; a month with none says gap. 3 March 2025 to 29 September 2026.

In 2026 so far: 1 day short of water for Protea Glen Tower, from 189 days with a report. The median supply in the city: 4 days.

102030Mar 2025: 0 days short of water, 0 critically low; reported 0 of 29 daysgap2025MApr 2025: 0 days short of water, 0 critically low; reported 0 of 30 daysgapAMay 2025: 0 days short of water, 0 critically low; reported 0 of 31 daysgapMJun 2025: 0 days short of water, 0 critically low; reported 3 of 30 daysJJul 2025: 0 days short of water, 0 critically low; reported 0 of 31 daysgapJAug 2025: 0 days short of water, 0 critically low; reported 0 of 31 daysgapASep 2025: 0 days short of water, 0 critically low; reported 0 of 30 daysgapSOct 2025: 0 days short of water, 0 critically low; reported 0 of 31 daysgapONov 2025: 0 days short of water, 0 critically low; reported 0 of 30 daysgapNDec 2025: 0 days short of water, 0 critically low; reported 0 of 31 daysgapDJan 2026: 0 days short of water, 0 critically low; reported 0 of 31 daysgap2026JFeb 2026: 1 day short of water, 1 critically low; reported 7 of 28 daysFMar 2026: 0 days short of water, 0 critically low; reported 20 of 31 daysMApr 2026: 0 days short of water, 0 critically low; reported 30 of 30 daysAMay 2026: 0 days short of water, 0 critically low; reported 31 of 31 daysMJun 2026: 0 days short of water, 0 critically low; reported 30 of 30 daysJJul 2026: 0 days short of water, 0 critically low; reported 31 of 31 daysJAug 2026: 0 days short of water, 0 critically low; reported 20 of 31 daysASep 2026: 0 days short of water, 0 critically low; reported 20 of 29 daysScity median 0city median 0city median 0city median 0city median 0city median 0city median 1city median 0city median 0

JW's reported status of the reservoir or tower, not measured water at taps. Boards from March 2025.

Source: Johannesburg Water's System Update boards and notices, read by us. How this record is made.

Cite this figure

watersearch (2026). “From April to September 2026 (six months), JW reported Protea Glen Tower short of water on 0 of 162 reported days”. Data release 2026-09-29-318d9dca. https://watersearch.co.za/reservoir/protea-glen-tower#fig-days

The data as a table
MonthDays short of waterDays reportedDays in recordCity median
March 2025gap0290
April 2025gap0300
May 2025gap0310
June 202503300
July 2025gap0310
August 2025gap031
September 2025gap030
October 2025gap031
November 2025gap030
December 2025gap031
January 2026gap031
February 202617280
March 2026020310
April 2026030300
May 2026031310
June 2026030300
July 2026031311
August 2026020310
September 2026020290

On Protea Glen Tower, its one outage lasted 12 hours

This is not a forecast. It is how long past outages lasted. Each dot is one past outage, placed by its length: the one outage on Protea Glen Tower. A hollow dot with an arrow had no reported end: JW's reports stopped before it ended, or it was still going at JW's last report. Either way it lasted at least that long (0 of 1).

012daysFrom 7 February 2026: 12 hourslongest 12 hours

JW's reported status of the reservoir or tower, not measured water at taps. Boards from March 2025.

Source: Johannesburg Water's System Update boards and notices, read by us. How this record is made.

Cite this figure

watersearch (2026). “On Protea Glen Tower, its one outage lasted 12 hours”. Data release 2026-09-29-318d9dca. https://watersearch.co.za/reservoir/protea-glen-tower#fig-base-rate

The data as a table
StartedLengthEnded
7 February 202612 hours7 February 2026

In words

2026 so far: JW reported it at “poor pressure to no water” or “critically low” on 1 day. JW published a report for it on 189 of the 272 days in the record; the other 83 days have no report, and we do not count them as normal. The median supply in the city had 4 such days.

2025: JW reported it at “poor pressure to no water” or “critically low” on 0 days. JW published a report for it on 3 of the 304 days in the record; the other 301 days have no report, and we do not count them as normal. The median supply in the city had 1 such day.

The one outage JW reported on this supply lasted 12 hours. This is a record of the past, not a forecast.

JW's boards first named Protea Glen Tower on 3 June 2025 and last on 29 September 2026: 334 statuses on 334 boards, over 192 days. 164 of those statuses announced a scheduled overnight closure, which we count apart, never as an outage.

Month by month

Days JW reported Protea Glen Tower at “poor pressure to no water” or “critically low”, out of the days it reported it at all. A month with few reported days says little.

MonthDays short of waterDays with a reportSame month a year earlier
March 2025No JW report this month
April 2025No JW report this month
May 2025No JW report this month
June 202503
July 2025No JW report this month
August 2025No JW report this month
September 2025No JW report this month
October 2025No JW report this month
November 2025No JW report this month
December 2025No JW report this month
January 2026No JW report this month
February 202617
March 2026020Too few reports to compare
April 2026030Too few reports to compare
May 2026031Too few reports to compare
June 2026030Too few reports to compare
July 2026031Too few reports to compare
August 2026020Too few reports to compare
September 2026020Too few reports to compare

Recent JW reports

The last 20 statuses JW printed for Protea Glen Tower, newest first.

JW reported a scheduled overnight closure on 29 September 2026 at 20:15. The board read “No pumping overnight.” JW put it on its website 1 October 2026 at 13:40. JW's page for this board ↗ · JW's image of the board ↗

JW reported supplying adequately on 29 September 2026 at 13:20. The board read “Supplying adequately.” JW put it on its website 1 October 2026 at 13:41. JW's page for this board ↗ · JW's image of the board ↗

JW reported supplying adequately on 28 September 2026 at 14:10. The board read “Supplying adequately.” JW put it on its website 1 October 2026 at 13:42. JW's page for this board ↗ · JW's image of the board ↗

No JW report since 25 September 2026. JW reported a scheduled overnight closure on 25 September 2026 at 19:40. The board read “No pumping overnight.” JW put it on its website 28 September 2026 at 10:32. JW's page for this board ↗ · JW's image of the board ↗

No JW report since 25 September 2026. JW reported supplying adequately on 25 September 2026 at 13:15. The board read “Supplying adequately.” JW put it on its website 28 September 2026 at 10:31. JW's page for this board ↗ · JW's image of the board ↗

No JW report since 23 September 2026. JW reported a scheduled overnight closure on 23 September 2026 at 18:35. The board read “No pumping overnight”. JW put it on its website 25 September 2026 at 10:40. JW's post ↗ · JW's image of the board ↗

No JW report since 23 September 2026. JW reported supplying adequately on 23 September 2026 at 11:55. The board read “Supplying adequately.” JW put it on its website 25 September 2026 at 10:40. JW's post ↗ · JW's image of the board ↗

No JW report since 22 September 2026. JW reported supplying adequately on 22 September 2026 at 11:05. The board read “Supplying adequately.” JW put it on its website 22 September 2026 at 15:41. JW's post ↗ · JW's image of the board ↗

No JW report since 21 September 2026. JW reported a scheduled overnight closure on 21 September 2026 at 19:00. The board read “No pumping overnight.” JW put it on its website 22 September 2026 at 14:09. JW's post ↗ · JW's image of the board ↗

No JW report since 21 September 2026. JW reported supplying adequately on 21 September 2026 at 14:05. The board read “Supplying adequately.” JW put it on its website 22 September 2026 at 14:08. JW's post ↗ · JW's image of the board ↗

No JW report since 18 September 2026. JW reported supplying adequately on 18 September 2026 at 18:45. The board read “Supplying adequately”. JW put it on its website 21 September 2026 at 09:06. JW's post ↗ · JW's image of the board ↗

No JW report since 18 September 2026. JW reported supplying adequately on 18 September 2026 at 09:45. The board read “Supplying adequately”. JW put it on its website 21 September 2026 at 09:04. JW's post ↗ · JW's image of the board ↗

No JW report since 17 September 2026. JW reported supplying adequately on 17 September 2026 at 15:25. The board read “Supplying adequately”. JW put it on its website 18 September 2026 at 10:41. JW's post ↗ · JW's image of the board ↗

No JW report since 17 September 2026. JW reported supplying adequately on 17 September 2026 at 09:15. The board read “Supplying adequately”. JW put it on its website 18 September 2026 at 10:40. JW's post ↗ · JW's image of the board ↗

No JW report since 16 September 2026. JW reported supplying adequately on 16 September 2026 at 15:25. The board read “Supplying adequately, no pumping overnight.” JW put it on its website 16 September 2026 at 15:56. JW's post ↗ · JW's image of the board ↗

No JW report since 16 September 2026. JW reported supplying adequately on 16 September 2026 at 09:45. The board read “Supplying adequately”. JW put it on its website 16 September 2026 at 15:52. JW's post ↗ · JW's image of the board ↗

No JW report since 15 September 2026. JW reported supplying adequately on 15 September 2026 at 16:55. The board read “Supplying adequately, no pumping overnight.” JW put it on its website 16 September 2026 at 10:17. JW's post ↗ · JW's image of the board ↗

No JW report since 15 September 2026. JW reported supplying adequately on 15 September 2026 at 10:10. The board read “Supplying adequately”. JW put it on its website 16 September 2026 at 10:11. JW's post ↗ · JW's image of the board ↗

No JW report since 14 September 2026. JW reported supplying adequately on 14 September 2026 at 10:07. The board read “Supplying adequately.” JW put it on its website 15 September 2026 at 11:24. JW's post ↗ · JW's image of the board ↗

No JW report since 11 September 2026. JW reported supplying adequately on 11 September 2026 at 11:45. The board read “Supplying adequately.” JW put it on its website 15 September 2026 at 10:58. JW's post ↗ · JW's image of the board ↗

Past outages

Each row is one outage: a stretch of time JW reported Protea Glen Tower at “poor pressure to no water” or “critically low”, newest first. An outage has no reported end when JW's reports stopped before it ended, or when it was still going at JW's last report; its length is then a minimum.

StartEndLength
7 Feb 2026, 08:407 Feb 2026, 21:0612 hours

What JW's boards cannot tell you

Source: JW's System Update boards and notices, read by us. The full list, and how this record is made.