Hector Norris Pump Station
A pump station in Johannesburg Water's Central system. What Johannesburg Water (JW) reported about it, from March 2025.
Latest JW report
JW reported supplying fairly on 19 November 2026 at 12:30. The board read “Supplying fairly.” JW put it on its website 19 November 2026 at 12:29. JW's page for this board ↗ · JW's image of the board ↗
Live updates during the day: Johannesburg Water ↗ and OurPower ↗. This page keeps the history.
Log a fault with JW: 010 061 4470
Suburbs it supplies
JW links 6 suburbs to Hector Norris Pump Station. A suburb draws on every supply JW lists for it at once, and JW does not say which streets each one reaches.
Not your suburb? Search for it to see its own supplies.
- Doornfontein: also Yeoville Reservoir (level low, 19 Nov).
- Jeppestown: also Yeoville Reservoir (level low, 19 Nov).
- Johannesburg CBD: also Crosby Reservoir (supplying fairly, 19 Nov).
- Marshalltown: JW names no other supply for it.
- Newtown: JW names no other supply for it.
- Selby: also Crown Gardens Reservoir (level low, 19 Nov).
Hector Norris Pump Station over time
In 2026 so far, JW reported Hector Norris Pump Station short of water on 43 days
What JW reported each day, 3 March 2025 to 19 November 2026, one row a month; the number at the right is the month's days short of water. Based on 324 days with a JW report. A day counts as short of water when JW's worst report for it that day was “poor pressure to no water” or “critically low”. Gaps: Hector Norris Pump Station: no report from 25 July 2025 to 31 January 2026.
- water as normal
- supplying fairly
- JW warned
- low, or weak in places
- short of water
- critically low
- shut for the night
- no JW report
- still filling in
JW's reported status of the reservoir or tower, not measured water at taps. Boards from March 2025.
Source: Johannesburg Water's System Update boards and notices, read by us. How this record is made.
Cite this figure
watersearch (2026). “In 2026 so far, JW reported Hector Norris Pump Station short of water on 43 days”. Data release 2026-11-19-f2f862b0. https://watersearch.co.za/reservoir/hector-norris-pump-station#fig-year
The data as a table
| Month | Days reported | Days in record | Adequate or fair | Poor pressure in places, or low | Warning: no water may occur | Poor pressure to no water | Critically low | Overnight closure |
|---|---|---|---|---|---|---|---|---|
| March 2025 | 18 | 29 | 17 | 1 | 0 | 0 | 0 | 0 |
| April 2025 | 13 | 30 | 13 | 0 | 0 | 0 | 0 | 0 |
| May 2025 | 13 | 31 | 11 | 1 | 0 | 1 | 0 | 0 |
| June 2025 | 28 | 30 | 25 | 0 | 0 | 3 | 0 | 0 |
| July 2025 | 24 | 31 | 16 | 1 | 0 | 5 | 0 | 2 |
| August 2025 | 0 | 31 | 0 | 0 | 0 | 0 | 0 | 0 |
| September 2025 | 0 | 30 | 0 | 0 | 0 | 0 | 0 | 0 |
| October 2025 | 0 | 31 | 0 | 0 | 0 | 0 | 0 | 0 |
| November 2025 | 0 | 30 | 0 | 0 | 0 | 0 | 0 | 0 |
| December 2025 | 0 | 31 | 0 | 0 | 0 | 0 | 0 | 0 |
| January 2026 | 0 | 31 | 0 | 0 | 0 | 0 | 0 | 0 |
| February 2026 | 6 | 28 | 6 | 0 | 0 | 0 | 0 | 0 |
| March 2026 | 20 | 31 | 7 | 11 | 0 | 2 | 0 | 0 |
| April 2026 | 29 | 30 | 0 | 29 | 0 | 0 | 0 | 0 |
| May 2026 | 30 | 31 | 3 | 8 | 0 | 19 | 0 | 0 |
| June 2026 | 29 | 30 | 0 | 5 | 13 | 11 | 0 | 0 |
| July 2026 | 29 | 31 | 5 | 8 | 9 | 7 | 0 | 0 |
| August 2026 | 22 | 31 | 19 | 2 | 0 | 1 | 0 | 0 |
| September 2026 | 21 | 30 | 8 | 10 | 1 | 2 | 0 | 0 |
| October 2026 | 25 | 31 | 21 | 1 | 2 | 1 | 0 | 0 |
| November 2026 | 17 | 19 | 14 | 1 | 2 | 0 | 0 | 0 |
From June to November 2026 (six months), JW reported Hector Norris Pump Station short of water on 22 of 143 reported days
Days per month short of water, stacked: critically low at the base. The tick is the median supply in the city that month. The strip under each bar is the share of days with a JW report; a month with none says gap. 3 March 2025 to 19 November 2026.
In 2026 so far: 43 days short of water for Hector Norris Pump Station, from 228 days with a report. The median supply in the city: 7 days.
JW's reported status of the reservoir or tower, not measured water at taps. Boards from March 2025.
Source: Johannesburg Water's System Update boards and notices, read by us. How this record is made.
Cite this figure
watersearch (2026). “From June to November 2026 (six months), JW reported Hector Norris Pump Station short of water on 22 of 143 reported days”. Data release 2026-11-19-f2f862b0. https://watersearch.co.za/reservoir/hector-norris-pump-station#fig-days
The data as a table
| Month | Days short of water | Days reported | Days in record | City median |
|---|---|---|---|---|
| March 2025 | 0 | 18 | 29 | 0 |
| April 2025 | 0 | 13 | 30 | 0 |
| May 2025 | 1 | 13 | 31 | 0 |
| June 2025 | 3 | 28 | 30 | 0 |
| July 2025 | 5 | 24 | 31 | 0 |
| August 2025 | gap | 0 | 31 | |
| September 2025 | gap | 0 | 30 | |
| October 2025 | gap | 0 | 31 | |
| November 2025 | gap | 0 | 30 | |
| December 2025 | gap | 0 | 31 | |
| January 2026 | gap | 0 | 31 | |
| February 2026 | 0 | 6 | 28 | 0 |
| March 2026 | 2 | 20 | 31 | 0 |
| April 2026 | 0 | 29 | 30 | 0 |
| May 2026 | 19 | 30 | 31 | 0 |
| June 2026 | 11 | 29 | 30 | 0 |
| July 2026 | 7 | 29 | 31 | 1 |
| August 2026 | 1 | 22 | 31 | 0 |
| September 2026 | 2 | 21 | 30 | 0 |
| October 2026 | 1 | 25 | 31 | 0 |
| November 2026 | 0 | 17 | 19 | 0 |
On Hector Norris Pump Station, half of its last 10 outages were over within 26 hours
This is not a forecast. It is how long past outages lasted. Each dot is one past outage, placed by its length: the last 10 outages on Hector Norris Pump Station. A hollow dot with an arrow had no reported end: JW's reports stopped before it ended, or it was still going at JW's last report. Either way it lasted at least that long (0 of 10).
JW's reported status of the reservoir or tower, not measured water at taps. Boards from March 2025.
Source: Johannesburg Water's System Update boards and notices, read by us. How this record is made.
Cite this figure
watersearch (2026). “On Hector Norris Pump Station, half of its last 10 outages were over within 26 hours”. Data release 2026-11-19-f2f862b0. https://watersearch.co.za/reservoir/hector-norris-pump-station#fig-base-rate
The data as a table
| Started | Length | Ended |
|---|---|---|
| 23 October 2026 | 15 hours | 24 October 2026 |
| 31 August 2026 | 2.8 days | 3 September 2026 |
| 28 July 2026 | 2.7 days | 31 July 2026 |
| 25 July 2026 | 8 hours | 25 July 2026 |
| 13 July 2026 | 32 hours | 14 July 2026 |
| 9 July 2026 | 24 hours | 10 July 2026 |
| 26 June 2026 | 24 hours | 27 June 2026 |
| 25 June 2026 | 28 hours | 26 June 2026 |
| 24 June 2026 | 6 hours | 24 June 2026 |
| 5 June 2026 | 5.3 days | 10 June 2026 |
JW's notices gave 19 end times for Hector Norris Pump Station. By the stated time, JW's boards showed the water back on none of the 17 that have passed
The water came back after the stated time 17 times; half of those times it was back within 8 days of it. Each row is one end time a JW notice stated for one supply, in date order (hollow dot), against the first board on which JW reported the supply supplying fairly or better and off bypass (filled dot). This asks more than the end of an outage, which comes at JW's first report better than “poor pressure to no water” or “critically low”. An arrow: no such board yet. From 24 notices.
JW's reported status of the reservoir or tower, not measured water at taps. Boards from March 2025.
Source: Johannesburg Water's System Update boards and notices, read by us. How this record is made.
Cite this figure
watersearch (2026). “JW's notices gave 19 end times for Hector Norris Pump Station. By the stated time, JW's boards showed the water back on none of the 17 that have passed”. Data release 2026-11-19-f2f862b0. https://watersearch.co.za/reservoir/hector-norris-pump-station#fig-stated
The data as a table
| Notice | Supply | Reason JW gave | Stated end | First board showing recovery | Against the stated time |
|---|---|---|---|---|---|
| 13 March 2025 | Hector Norris Pump Station | Installation of a new electrical meter | 13 March 2025 16:00 | 24 March 2025 13:40 | 10 days 21 hours after the stated time |
| 23 April 2025 | Hector Norris Pump Station | Installation of a new valves | 25 March 2025 12:00 | 25 March 2025 14:15 | 2 hours 15 minutes after the stated time |
| 16 April 2025 | Hector Norris Pump Station | Dummy run for proposed | 16 April 2025 22:00 | 25 April 2025 13:45 | 8 days 15 hours after the stated time |
| 23 April 2025 | Hector Norris Pump Station | Installation of a new valves | 25 April 2025 12:00 | 25 April 2025 13:45 | 1 hour 45 minutes after the stated time |
| 23 April 2025 | Hector Norris Pump Station | Installation of a new valves | 25 April 2025 18:00 | 28 April 2025 14:00 | 2 days 20 hours after the stated time |
| 8 June 2025 | Hector Norris Pump Station | Repairs to air valve along the G15 bulk line from Forest Hill Reservoir towards Hector Norris Pumpstation | 8 June 2025 18:00 | 9 June 2025 21:30 | 1 day 3 hours after the stated time |
| 30 June 2025 | Hector Norris Pump Station | Installation of piping at pumpstation and repairing of leaks at bypass chamber | 2 July 2025 06:00 | 5 July 2025 15:10 | 3 days 9 hours after the stated time |
| 8 August 2025 | Hector Norris Pump Station | Repair of 950mm Steel Pipe | 8 August 2025 00:00 | 1 February 2026 11:25 | 177 days 11 hours after the stated time |
| 19 August 2025 | Hector Norris Pump Station | Connecting the 110mm new pipeline extension to the existing 110mm | 19 August 2025 17:00 | 1 February 2026 11:25 | 165 days 18 hours after the stated time |
| 22 August 2025 | Hector Norris Pump Station | Repairs on Pump sets | 22 August 2025 16:00 | 1 February 2026 11:25 | 162 days 19 hours after the stated time |
| 28 November 2025 | Hector Norris Pump Station | Installation of valves at the bypass chamber and pumpstation, including tie in | 30 November 2025 20:00 | 1 February 2026 11:25 | 62 days 15 hours after the stated time |
| 8 April 2026 | Hector Norris Pump Station | Testing and commissioning pump set 2.; Testing and Commissioning pump set 2 | 8 April 2026 16:00 | 7 May 2026 18:27 | 29 days 2 hours after the stated time |
| 21 May 2026 | Hector Norris Pump Station | Johannesburg Water will be conducting a dummy run for a period of four (4) days prior to commencing with structural repairs inside the reservoir. | 24 May 2026 17:00 | 3 July 2026 10:10 | 39 days 17 hours after the stated time |
| 25 June 2026 | Hector Norris Pump Station | Repair of 450mm Steel Pipe | 25 June 2026 18:00 | 3 July 2026 10:10 | 7 days 16 hours after the stated time |
| 1 July 2026 | Hector Norris Pump Station | Repair a major burst pipe on the 450mm bulk line. | 2 July 2026 06:00 | 3 July 2026 10:10 | 1 day 4 hours after the stated time |
| 1 July 2026 | Hector Norris Pump Station | Repair on Major burst pipes on 450 mm & 600 mm Steel pipes. | 3 July 2026 02:00 | 3 July 2026 10:10 | 8 hours 10 minutes after the stated time |
| 16 October 2026 | Hector Norris Pump Station | Major burst pipes on bulk supply line to Parktown Reservoir (750 mm steel pipe) | 17 October 2026 06:00 | 20 October 2026 14:10 | 3 days 8 hours after the stated time |
| 19 November 2026 | Hector Norris Pump Station | Installation of blank flange on the inlet to the Yeoville Reservoir 3 to allow the installation of the reservoir liner to proceed without delay. This exercise will also assist in monitoring and assessing whether the groundwater ingress issue is subsiding | 19 November 2026 19:00 | the stated end is still ahead | |
| 24 November 2026 | Hector Norris Pump Station | The contractor shall install a blank flange on the inlet to Reservoir 3 to allow the installation of the reservoir liner to proceed without delay. This exercise will also assist in monitoring and assessing whether the groundwater ingress issue is subsiding. | 24 November 2026 19:00 | the stated end is still ahead |
Up the supply chain
On 9 July 2026, JW reported Hector Norris Pump Station poor pressure to no water
Where the water comes from, top to bottom, and what JW reported for each part on 9 July 2026. A suburb draws on every supply listed at once; JW does not say which street each one reaches.
Showing 9 July 2026. Other days: 23 October 2026, 31 August 2026, 28 July 2026, 25 July 2026, 13 July 2026, 9 July 2026, or the last day.
Bulk supply
JW's boards carry no status for Rand Water's stations.
Feeds Hector Norris Pump Station: stated by JW source ↗On this day JW's boards printed poor incoming supply for Hector Norris Pump Station: trouble upstream of the reservoir.
System
JW reported 1 of 16 supplies in it short of water; 2 had no report.
Supply
JW reported poor pressure to no water.
As printed: “11:55 No pumping, poor incoming supply.”; “19:10 Supplying fairly. Poor pressure to no flows expected in some areas”
In the Central system: listed on a JW page source ↗ Fed from Zwartkopjes Pump Station (Rand Water): stated by JW source ↗JW's reported status of the reservoir or tower, not measured water at taps. Boards from March 2025.
Source: Johannesburg Water's System Update boards and notices, read by us. How this record is made.
Cite this figure
watersearch (2026). “On 9 July 2026, JW reported Hector Norris Pump Station poor pressure to no water”. Data release 2026-11-19-f2f862b0. https://watersearch.co.za/reservoir/hector-norris-pump-station#fig-chain
The data as a table
| Part | What it is | Feeds | How we know | On 9 July 2026 |
|---|---|---|---|---|
| Zwartkopjes Pump Station (Rand Water) | Rand Water station | Hector Norris Pump Station | stated by JW | No JW status for it |
| Central system | System | JW's system page | 1 of 16 supplies short of water; 2 with no report | |
| Hector Norris Pump Station | Pump station | JW's page or notice | poor pressure to no water |
In words
2026 so far: JW reported it at “poor pressure to no water” or “critically low” on 43 days. JW published a report for it on 228 of the 323 days in the record; the other 95 days have no report, and we do not count them as normal. The median supply in the city had 7 such days.
2025: JW reported it at “poor pressure to no water” or “critically low” on 9 days. JW published a report for it on 96 of the 304 days in the record; the other 208 days have no report, and we do not count them as normal. The median supply in the city had 1 such day.
The last 10 outages JW reported on this supply lasted a median of 26 hours; the longest 5.3 days. This is a record of the past, not a forecast.
JW's boards first named Hector Norris Pump Station on 3 March 2025 and last on 19 November 2026: 559 statuses on 559 boards, over 324 days. 37 of those statuses announced a scheduled overnight closure, which we count apart, never as an outage.
Month by month
Days JW reported Hector Norris Pump Station at “poor pressure to no water” or “critically low”, out of the days it reported it at all. A month with few reported days says little.
| Month | Days short of water | Days with a report | Same month a year earlier |
|---|---|---|---|
| March 2025 | 0 | 18 | |
| April 2025 | 0 | 13 | |
| May 2025 | 1 | 13 | |
| June 2025 | 3 | 28 | |
| July 2025 | 5 | 24 | |
| August 2025 | No JW report this month | ||
| September 2025 | No JW report this month | ||
| October 2025 | No JW report this month | ||
| November 2025 | No JW report this month | ||
| December 2025 | No JW report this month | ||
| January 2026 | No JW report this month | ||
| February 2026 | 0 | 6 | |
| March 2026 | 2 | 20 | 0 of 18 days |
| April 2026 | 0 | 29 | Too few reports to compare |
| May 2026 | 19 | 30 | Too few reports to compare |
| June 2026 | 11 | 29 | 3 of 28 days |
| July 2026 | 7 | 29 | 5 of 24 days |
| August 2026 | 1 | 22 | Too few reports to compare |
| September 2026 | 2 | 21 | Too few reports to compare |
| October 2026 | 1 | 25 | Too few reports to compare |
| November 2026 | 0 | 17 | Too few reports to compare |
Recent JW reports
The last 20 statuses JW printed for Hector Norris Pump Station, newest first.
JW reported supplying fairly on 19 November 2026 at 12:30. The board read “Supplying fairly.” JW put it on its website 19 November 2026 at 12:29. JW's page for this board ↗ · JW's image of the board ↗
JW reported a warning that poor pressure to no water may occur on 18 November 2026 at 14:05. The board read “No pumping poor incoming supply”. JW put it on its website 18 November 2026 at 14:06. JW's post ↗ · JW's image of the board ↗
JW reported low on 17 November 2026 at 19:05. The board read “Supplying fairly but low”. JW put it on its website 17 November 2026 at 19:07. JW's page for this board ↗ · JW's image of the board ↗
No JW report since 17 November 2026. JW reported a warning that poor pressure to no water may occur on 17 November 2026 at 10:25. The board read “No pumping due to low pressure”. JW put it on its website 17 November 2026 at 10:25. JW's post ↗ · JW's image of the board ↗
No JW report since 16 November 2026. JW reported low on 16 November 2026 at 18:50. The board read “Supplying fairly but low”. JW put it on its website 16 November 2026 at 18:55. JW's page for this board ↗ · JW's image of the board ↗
15 earlier reports
No JW report since 16 November 2026. JW reported supplying fairly on 16 November 2026 at 10:40. The board read “Supplying fairly and stable.” JW put it on its website 16 November 2026 at 14:20. JW's post ↗ · JW's image of the board ↗
No JW report since 15 November 2026. JW reported supplying fairly on 15 November 2026 at 09:25. The board read “Supplying fairly and stable”. JW put it on its website 15 November 2026 at 09:28. JW's page for this board ↗ · JW's image of the board ↗
No JW report since 14 November 2026. JW reported supplying fairly on 14 November 2026 at 10:05. The board read “Supplying fairly”. JW put it on its website 14 November 2026 at 10:08. JW's page for this board ↗ · JW's image of the board ↗
No JW report since 13 November 2026. JW reported supplying fairly on 13 November 2026 at 11:50. The board read “Supplying fairly”. JW put it on its website 13 November 2026 at 11:54. JW's page for this board ↗ · JW's image of the board ↗
No JW report since 12 November 2026. JW reported supplying fairly on 12 November 2026 at 20:05. The board read “Supplying fairly and stable.” JW put it on its website 12 November 2026 at 20:08. JW's post ↗ · JW's image of the board ↗
No JW report since 11 November 2026. JW reported supplying fairly on 11 November 2026 at 18:25. The board read “Supplying fairly and stable.” JW put it on its website 11 November 2026 at 18:25. JW's page for this board ↗ · JW's image of the board ↗
No JW report since 10 November 2026. JW reported supplying fairly on 10 November 2026 at 12:10. The board read “Supplying fairly and stable”. JW put it on its website 10 November 2026 at 12:10. JW's page for this board ↗ · JW's image of the board ↗
No JW report since 9 November 2026. JW reported supplying fairly on 9 November 2026 at 12:00. The board read “Supplying fairly and stable.” JW put it on its website 9 November 2026 at 12:04. JW's post ↗ · JW's image of the board ↗
No JW report since 6 November 2026. JW reported supplying fairly on 6 November 2026 at 18:20. The board read “Supplying fairly”. JW put it on its website 6 November 2026 at 18:18. JW's page for this board ↗ · JW's image of the board ↗
No JW report since 6 November 2026. JW reported supplying fairly on 6 November 2026 at 10:35. The board read “Supplying fairly and improving.” JW put it on its website 6 November 2026 at 10:43. JW's page for this board ↗ · JW's image of the board ↗
No JW report since 5 November 2026. JW reported supplying fairly on 5 November 2026 at 18:25. The board read “Supplying fairly”. JW put it on its website 5 November 2026 at 18:37. JW's post ↗ · JW's image of the board ↗
No JW report since 5 November 2026. JW reported supplying fairly on 5 November 2026 at 10:05. The board read “Supplying fairly”. JW put it on its website 5 November 2026 at 10:56. JW's post ↗ · JW's image of the board ↗
No JW report since 4 November 2026. JW reported supplying fairly on 4 November 2026 at 17:50. The board read “Supplying fairly”. JW put it on its website 4 November 2026 at 17:50. JW's post ↗ · JW's image of the board ↗
No JW report since 4 November 2026. JW reported supplying fairly on 4 November 2026 at 09:50. The board read “Supplying fairly.” JW put it on its website 4 November 2026 at 09:50. JW's page for this board ↗ · JW's image of the board ↗
No JW report since 3 November 2026. JW reported supplying fairly on 3 November 2026 at 18:35. The board read “Supplying fairly.” JW put it on its website 3 November 2026 at 18:40. JW's page for this board ↗ · JW's image of the board ↗
Past outages
Each row is one outage: a stretch of time JW reported Hector Norris Pump Station at “poor pressure to no water” or “critically low”, newest first. An outage has no reported end when JW's reports stopped before it ended, or when it was still going at JW's last report; its length is then a minimum.
| Start | End | Length |
|---|---|---|
| 23 Oct 2026, 18:20 | 24 Oct 2026, 09:20 | 15 hours |
| 31 Aug 2026, 18:25 | 3 Sep 2026, 12:45 | 2.8 days |
| 28 Jul 2026, 19:25 | 31 Jul 2026, 12:59 | 2.7 days |
| 25 Jul 2026, 10:30 | 25 Jul 2026, 18:50 | 8 hours |
| 13 Jul 2026, 11:15 | 14 Jul 2026, 19:40 | 32 hours |
| 9 Jul 2026, 11:55 | 10 Jul 2026, 12:09 | 24 hours |
| 26 Jun 2026, 20:09 | 27 Jun 2026, 19:45 | 24 hours |
| 25 Jun 2026, 10:03 | 26 Jun 2026, 13:50 | 28 hours |
| 24 Jun 2026, 12:55 | 24 Jun 2026, 19:20 | 6 hours |
| 5 Jun 2026, 12:55 | 10 Jun 2026, 19:30 | 5.3 days |
| 4 Jun 2026, 12:40 | 4 Jun 2026, 20:35 | 8 hours |
| 3 Jun 2026, 15:20 | 3 Jun 2026, 21:00 | 6 hours |
| 23 May 2026, 09:20 | 1 Jun 2026, 10:40 | 9.1 days |
| 15 May 2026, 15:55 | 22 May 2026, 10:45 | 6.8 days |
| 14 May 2026, 14:50 | 14 May 2026, 20:05 | 5 hours |
| 13 May 2026, 12:10 | 13 May 2026, 19:30 | 7 hours |
| 5 May 2026, 20:27 | 6 May 2026, 19:03 | 23 hours |
| 13 Mar 2026, 21:20 | 15 Mar 2026, 15:50 | 42 hours |
| 30 Jun 2025, 09:45 | 5 Jul 2025, 15:10 | 5.2 days |
| 8 Jun 2025, 08:45 | 9 Jun 2025, 21:30 | 37 hours |
| 21 May 2025, 10:45 | No reported end | at least 36 hours |
What JW's boards cannot tell you
- Whether water reaches your street or your tap.
- Which streets lose water first: JW warns of higher-lying areas but does not name the streets.
- Why a supply ran low, unless a JW notice gives a reason.
- Pipe bursts, tankers and valve work, which are not on the boards.
Source: JW's System Update boards and notices, read by us. The full list, and how this record is made.